How Ray is Saving Money

Ray is saving money by not doing repairs on the roads in the Terrace and the
Manor. Sure this looks good on paper right now, but how much is this going to cost us when every road in these two communities needs to be replaced?

The Repaving project from the Terrace Boat Launch to Hwy J has only been worked on from hwy N to to the halfway point going to Ray's house. That portion of the road only has 13 homes and the condition of the portion that was not worked on is deteriorating in need of repairs.

Like I have stressed before......
What is it about town chairmans paving the roads to their homes?

On top of that, what has Applied Technologies done for us with road repair besides suck us dry?